Monday, 31 January 2011

Transitions

today group 4 edited some of the clips and added transitons to the opening scene, we have nearly finished the editing.

Tuesday, 25 January 2011

Rough cut -24/1/11

This is a screenshot took on the 24/1/11 this screenshot shows our rough-cut of the opening sequence (all the footage in order as shown in the story boards) 


In the lesson, my role was to cut down some of the scenes so that we could reduce some of the time along with changing the contrast saturation etc to make the scenes look better and improve the quality of the opening sequence.


I have learned how to cut down scenes and change the saturation etc.


We have changed some ideas from our storyboard for instance we firstly got rid of the "8 months later" and also changed several scenes round to fit with the voice over better. 


To finish this opening sequence we still need to cut down alot of time , add in transistions and do the credits , along with add in the music for the dance scenes we have this is due to the cameras not being the best quality so therefore we have to edit the scenes to improve them.  

Thursday, 20 January 2011

Filming/Blog update: 20th jan 2011.

so far since monday we have filmed several more scenes in the opening scene. We are also all staying back tonight along with steve to finish off the remaining scenes that need to be done, (i.e the dialoug scenes and fight scene) this should be finished off in time for tomorrow so that we can all proceed to begin editing from monday onwards.

This is also a schedule from monday/tuesday that was made outlinging what we need to film and whats been done.


What?When?Who?
Voice Over10.01.11Vikkie, YaseminDONE
Dancing Feet10.01.11Vikkie, YaseminDONE
Curtain Scene Backstage18.01.11Andrew, DavidDONE
Film Opening Titles19.01.11Vikkie, Yasemin, Andrew, DavidDONE
Backstage Scene 20.01.11Vikkie, Yasemin, Andrew, DavidDONE
Start Editing Credit Title24.01.11 Andrew, David
Edit footage and tweak.24.01.11Vikkie, Yasemin, Andrew, David   

Monday, 17 January 2011

Filming/blog update : 17th january 2011

Our group are plannng to continue our filming this week , however we need to ensure that we can get all the actors we need and if we can get locations avaliable for filming, were preferbly planning to film after school.

Saturday, 1 January 2011

Production schedule for filming version 1.

1.     Locations List:
a.     Maysebrook Park
b.    Boothroyd Hall
c.     Dance Studio

2.     Prop List:
a.     CD Player

3.     Costume List:
a.     Trainers
b.    Combats
c.     Jogging Bottoms
d.    Shorts
e.     T-Shirts
f.      Hoodies
g.     Vests

4.     Actors List:
a.     Vikkie Heed
b.    David Preston-Rider
c.     Steve Hobday
d.    .
e.     .

5.     Equipment List:
a.     CD Player
b.    Camera
c.     Charger
d.    Tripod
e.     Storyboard
f.      Lighting
g.     Dance Studio

Were also looking at a time frame of a few days for filming, however some of the actors we wish to use are only available during the weekends which means we have to arrange times and specific days to which we can film.